What it looks like installed

Six delivered projects, with the numbers that mattered.

On-site photography for these projects is being cleared for publication. The summaries below list what was delivered, where, and what changed for the client.
01 · Germany + Austria · 2025 Pharmacy chain, 210 branches

Weekly promotions pushed to 210 branches in one batch

Shelf-edge e-paper replaced printed promotion cards across 210 stores. Each unit runs on battery for about four months per charge and is updated from the head office CMS every Thursday.

Print spend on promotions cut to zero
Update time: 3 days → under 10 minutes
No cabling work in any branch
860 × E-Poster 13 Colour View details
02 · Southeast Asia · 2025 Metro operator, 2 lines

Platform signage on solar, no grid connection per screen

31.5-inch full-colour ChLCD panels with photovoltaic top-up, mounted on platform columns. Static images consume no power, so a small panel keeps each unit running year-round.

Zero mains cabling per platform
Legible in direct platform sunlight
Held up through a 38 °C summer
340 × E-Poster 31 Colour View details
03 · Spain + Portugal · 2026 Hotel group, 14 properties

One frame spec across 14 properties, walnut for the heritage sites

13.3-inch frames in walnut for heritage properties and aluminium for the modern ones, all on the same CMS. Lobby art, corridor signage and seasonal menus share one content library.

One hardware spec for all 14 sites
Seasonal content changed in an afternoon
No visible cabling in listed buildings
620 × FrameOne 13 View details
05 · Middle East · 2026 Flagship store, 3 floors

180 m² of glass façade turned into a screen — and back

S-series invisible LED fitted to the mullion grid across three floors. At 92–95% transparency the store keeps its daylight and street visibility, with rear service from inside the building.

Daylight and street view preserved
Rear service — no scaffolding needed
Fitted to the existing mullion grid
180 × HoloGlass S View details
06 · United States · 2026 Tech campus, 6 buildings

1,400 door plates with no electrician on site

7-inch battery door plates across six buildings, mounted with two screws each and driven by the client's room-booking system. A floor reorganisation now means a CMS change, not a reprint.

Installed in 9 days with 2 fitters
Reorganisations cost nothing to re-label
Battery life over 6 months per charge
1,400 × FrameOne 7 View details
Ready to specify?

Tell us the room. We will spec it.

Send dimensions, quantities and the market, and we will come back with a landed quote.